On-grid
Tied to KSEB. You use solar first; surplus is exported and adjusted through net metering, as per current KSEB rules. For safety, a standard on-grid inverter switches off during a power cut.
Tied to KSEB. You use solar first; surplus is exported and adjusted through net metering, as per current KSEB rules. For safety, a standard on-grid inverter switches off during a power cut.
Grid-tied, with battery storage, so selected loads can continue during an outage. Suitable for homes and sites that want both net metering (where eligible) and backup. Design is more specific: battery size, essential-load circuits, and roof area all matter.
A stand-alone array and battery bank, used where a grid connection is absent, unreliable, or not the point of the project. Sizing is driven by the loads you must keep and the days of autonomy you want — not by a household subsidy table.
If your main goal is a lower KSEB bill and you can accept the system pausing in an outage, on-grid is usually the starting point. If power cuts are the problem you actually want solved, say so early, so the visit can include a hybrid or off-grid conversation.
PM Surya Ghar Central Financial Assistance is aimed at eligible residential rooftop systems and is commonly associated with grid-connected installations, as per current MNRE guidelines. Hybrid designs may have an on-grid portion; eligibility should be verified for the exact configuration, not assumed from a webpage. Off-grid systems are designed around energy independence, not around that CFA table. Please read the subsidy guide and confirm the current rules before publishing any figure.
A no-obligation survey anywhere in Kerala, from the Sooranad practice C Gopakumar leads.