Home / Case Studies / A 40 kW campus rooftop in Palakkad
Sample case study — replace with a real, consented project
Institutional · Palakkad · 40 kW

A 40 kW campus rooftop in Palakkad

A daytime-load array for a school or similar campus — sized so generation tracks teaching hours, not a household bill.

A 40 kW campus rooftop in Palakkad
Sample

The challenge

The brief is a sample: an institution in Palakkad district with a strong daytime load (classrooms, offices, labs) and a large but partly obstructed roof. The design needed to respect roof structure, access for maintenance, and a timetable that could not be disrupted for long.

The solution

A 40 kW on-grid rooftop array was laid out on the most open roof planes and tied to the campus distribution. Because PM Surya Ghar Central Financial Assistance is for residential rooftop solar, this institutional sample does not assume a CFA subsidy. Net-metering or accounting follows the applicable KSEB arrangement for the connection type.

Results

Generation and savings figures below are estimates for a sample 40 kW daytime-load system, not audited campus data. Replace them with metered units and a consented institution name before publishing.

40 kW

System capacity (sample)

~4,800 units (estimate)

Monthly generation (estimate)

~₹33,600 / month (estimate)

Savings (estimate)

Timeline

Survey

Load, roof and electrical study (sample schedule)

Install

Phased rooftop install around campus hours (sample)

Commission

Interconnection and handover (sample)

Gallery

Photographs below are stand-ins until the client provides project photos.

Free site visit

Let Gopakumar's team look at your roof.

A no-obligation survey anywhere in Kerala, from the Sooranad practice C Gopakumar leads.

Led by C Gopakumar, founder of G&G Associates, Sooranad, Kollam.

Chat